How to open a fitness club in Tashkent
Most mistakes when opening a club are expensive not because they are complicated but because they are noticed late: the lease is signed, the equipment is bought, and the first clients arrive to find a queue at the front desk. Below is the order of decisions worth going through before you take on any obligations.
Format first, premises second
A club and a studio live by different rules. A club of 500 square meters and up needs admin shifts, turnstiles and protection of the client base. A single-program studio needs automatic booking and retention, and the owner often doubles as the administrator. That choice determines your staff, your equipment and which management system fits you.
Count concurrent load, not floor area
Revenue rests not on square meters but on how many people can train at once and how many times a day the gym turns over. For a pool that means lanes and sessions, for group halls the group capacity, for the gym floor the number of people at peak hour. These numbers must go into the management system from the start, or sales will outrun what the space can physically hold.
Card payments are set up in advance
Clients in Uzbekistan pay with Uzcard and Humo cards. Payments run through the Atmos gateway with a 2 percent fee. Onboarding takes time, so starting it on opening day is too late: by the first sales the acquiring must already work, and the membership must be payable right in the app.
Client records from day one, not month three
A club that starts in a notebook or in Excel pays for it twice: first it loses part of the contacts, then it spends weeks migrating. Migrating the base from Excel or another system into FitBase is included in the plan and costs nothing, but it is simpler to set records up correctly from the start. A studio launches in three days; a club with several halls usually needs about two weeks.
Sales start before opening
You can sell memberships while the renovation is still going: the club app ships to the App Store and Google Play under your name and logo, class booking opens in advance, payment goes through online. By opening day you have a filled schedule rather than an empty gym and hope for passers-by.
What to put in writing
Before signing the lease, fix down: the list of programs and the capacity of each hall, the membership line-up with prices, the freezing and cancellation rules, and the trainer payroll scheme. These same four documents are what the system setup needs, and if they exist, getting records running takes days rather than a month of correspondence.